| |
| Aludra (AF-55) |
Conducted in-port replenishments at Cam Ranh Bay, Vung Tau and An Thoi during March 1969 and docked to pier at Da Nang April 17-18, 1969 |
| Benner (DD-807) |
Operated on inland Ganh Rai Bay and Rung Sat Special Zone during June 26-July 1, 1968 |
| Bigelow (DD-942) |
Docked to pier at Da Nang for one hour on April 19, 1967 |
| Castor (AKS-1) (General Stores Ship) |
Docked to pier at Da Nang on October 7, 1966 |
| Colonial (LSD-18) (Landing Ship Dock) |
Traveled on Saigon River to Nha Be on June 22 and September 25-30, 1969 |
| Current (ARS-22) (Salvage Ship) |
Conducted salvage operations on Saigon River during July 1964 and April 1967 and inland waterway of Qui Nhon Bay/Harbor during May 1967 and August 1971 |
| Dahlgren (DLG-12) (Guided Missile Cruiser) |
Sent motorized whaleboat and captain�s gig ashore while anchored in Da Nang Harbor on June 4, 1967 |
De Haven (DD-727) |
Operated on Saigon River during early March 1967 |
| Du Pont (DD-941) |
Operated on Mekong River Delta during October 1968 |
| Durham (LKA-114) (Amphibious Cargo Ship) |
Docked to piers at Da Nang during March 20-21, July 20-21, August 18-19, and September 7, 1970 |
Eldorado (AGC-11) (Amphibious Force Flagship) |
Sent crewmembers ashore for beach party at Cam Ranh Bay during July 1970 |
| Esteem (MSO-438) |
Crewmembers painted a Vietnamese orphanage while docked at inland waterway Qui Nhon Bay/Harbor during December 1967 |
| Eversole (DD-789) |
Sent motorized whaleboat ashore to Chu Lai from offshore anchorage to transfer two crewmembers on July 25, 1972 |
| Finch (DER-328) |
Crewmembers painted a Vietnamese orphanage while docked at inland waterway Qui Nhon Bay/Harbor during December 1967 |
| Force (MSO-445) |
Docked to pier at Cam Ranh Bay March 13-15, 1972 and at Vung Tau April 25-May 3, 1972 |
| |
| General R M Blatchford (AP-153) (Transport Ship) |
Landed elements of 1st Infantry Division at Vung Tau by small boats during October 1965 |
| George K. Mackenzie (DD-836) |
Operated in Ganh Rai Bay area north of Vung Tau during February 1969 |
| Graffias (AF-29) (Stores Ship) |
Docked to pier at Da Nang for resupply on February 20 and November 25, 1967, and conducted other in-port replenishments at An Thoi and Vung Tau during 1967 |
| Grapple (ARS-7) (Salvage Ship) |
Conducted numerous repair and salvaging operations while moored to piers in Da Nang, Chu Lai, Cam Ranh Bay, and Tan My from November 1970 through April 1971 and August 1972 through January 1973 |
| Herbert J Thomas (DD-833) |
Operated in Mekong River Delta during December 1966 |
|
Hermitage (LSD-34) |
Conducted numerous troop landings in Da Nang area from June through October 1967 and docked to Da Nang pier June 2-3, 1967 |
| Hugh Purvis (DD-709) |
Operated on the inland waters of Qui Nhon Bay during January 1969 |
| Jamestown (AGTR-3) |
Conducted numerous month-long deployments along the Vietnam coast collecting data, with photographic evidence that crewmembers went ashore, between January 1966 and September 1969 |
|
Lenawee (APA-195) |
Conducted troop and supply landings at Da Nang and Chu Lai from April 1965 to December 1966 |
| Long Beach (CGN-9) (Guided Missile Cruiser, Nuclear) |
While anchored in Da Nang Harbor, deck logs show that utility boats went ashore with passengers on May 5, 1968 and the Captains Gig went ashore on September 4, 1969 |
| McKean (DD-784) |
Operated on Mekong and Saigon River Deltas during March 14-15, 1967 |
| Morton (DD-948) |
Operated on Vung Ganh Rai and Saigon River during April 1966 and February 1969 |
|
Nicholas (DD-449) (Destroyer) |
Operated on Mekong River Delta during January 1967 and Ganh Rai Bay and Mekong River Delta during August 1968 |
| Norris (DD-859) |
Conducted operations on inland Song Nga Bay during November-December 1966 |
| Oak Hill (LSD-7) |
Served as station and repair ship in Da Nang Harbor with evidence of crewmembers going ashore from January through March 1966 |
| O�Bannon (DD-450) |
Operated on Saigon River during May 22-24, 1966 |
| Okinawa (LPH-3) (Landing Platform Helicopter |
Docked to pier at Cam Ranh Bay to offload aircraft during May 1971 |
| Ozbourn (DD-846) |
Conducted fire support missions on Saigon River October-November 1965 and August-October 1966 |
| Paul Revere (APA-248) |
Assisted with salvage of the USS Card (ACV-11) in Saigon Harbor on Saigon River during May 1964
Conducted small boat troop landings at Qui Nhon, Quang Ngai Province, and elsewhere from August 1965 through April 1966 and August through November 1967.
|
| Point Defiance (LSD-31) |
Operated on Saigon River during March 1967 and conducted several operations on Saigon River to Saigon Port during October and November 1968
Conducted numerous troop and supply landings with small boats at Da Nang, Qui Nhon, Van Tuong, and Kien Hoa from May 1965 through October 1972.
|
| Prichett (DD-561) |
Operated on Mekong River Delta and Saigon River during August 1969 |
| Prime (MSO-466) |
Docked to pier at Da Nang on February 16, 1967 |
|
Richard B. Anderson (DD-786) |
Docked to pier at Da Nang on August 29, 1972 |
| Richard S Edwards (DD-950) |
Operated on Mekong River Delta in Province of Kien Hoa during February 28 and March 1, 1969 |
| Rupertus (DD-851) |
Operated on Saigon River during May 1969 |
| Saint Paul (CA-73) (Cruiser) |
While anchored in Da Nang Harbor on May 9, 1969 and May 25, 1970, deck logs show limited small boat operations to shore |
| Shelton (DD-790) |
Operated on Saigon River during January 16, 1966 |
| Steinaker (DD-863) |
Anchored off Phan Thiet July 25- August 3, with crewmembers going ashore to visit Junk Base |
| Tolovana (AO-64) (Fleet Oiler) |
Sent crew ashore for beach party at Phu Quoc during May 1971 |
| Towers (DDG-9) |
Operated on Saigon River and Rung Sat Special Zone during July 1966 |
| Warbler (MSC-206) (Minesweeper-Coastal) |
Docked to pier at Cam Ranh Bay July 22-25, 1964 and June 18 and July 6, 1970 |
| Washburn (AKA/LKA-108) |
Conducted numerous small boat beach landings at Da Nang, Thon My Thuy, Hue on Perfume River, and Dong Ha on Cua Viet River from 1965 to 1969 |